Electrical / Controls Engineering Intern
Linde Gas Pittsburg, California May 2026–present
I upgraded the eight-node SCADA environment at a Linde plant and now maintain it alongside tools for configuration, alarm analysis and controls requests. A Python tool I built reduced a GE iFIX node setup from the four-to-six-hour procedure to under 30 minutes.